Central Queensland and the Central Highlands

Armstrong Operations is based in Emerald and works across Central Queensland. This is coal, cattle and cropping country, and our fleet is set up for the work it generates: haul roads, gravel roads, dams and bulk earthworks.

Areas served

Across the Central Highlands and out from there

Straight line

  • Emerald
  • Capella 50 km
  • Tieri 60 km
  • Springsure 65 km
  • Blackwater 75 km
  • Clermont 95 km
  • Middlemount 95 km
  • Dysart 105 km
  • Rolleston 115 km
  • Moranbah 170 km

A guide, not a boundary. If your job is further out, ask: how long the work runs matters more than how far away it is.

What the region asks of a contractor

Central Queensland runs on long distances and unsealed roads. Mines and quarries through the Bowen Basin need haul roads holding their shape and dust kept inside their conditions. Councils maintain enormous lengths of gravel road with finite plant. Grazing and cropping country needs dams that hold water, banks that stay put and tracks that are still usable after rain.

That calls for a grader, roller and water truck working as one crew, an excavator sized for bulk work and dam clean-outs, and haulage to move material that’s rarely close to where it’s needed. That’s our fleet.

Three industries, three different jobs

Resources

The Bowen Basin runs through this region, and the earthmoving it generates is mostly support work. That means haul roads that wear under loaded trucks, dust that’s a condition of approval, stockpiles and load-out, and rehabilitation earthworks around the edges. It suits a contractor who arrives inducted and ready, and it runs to shutdown windows that don’t move, so we plan around both.

Grazing and cropping

The same country carries cattle, and the Emerald district carries irrigated cropping as well. That brings a different kind of job: dams that have silted up and lost storage you’ve already paid for, banks and contours, and access tracks that need to handle the wet. Laneways and pads around infrastructure come into it too. Property work is seasonal, so we scope each job to what it actually needs.

Councils and civil

Local government here maintains long stretches of unsealed road, and the work builds after every wet season. Add subdivisions, industrial pads, quarry access and civil contractors who need extra capacity for a stage, and that’s the third strand: work to a written specification, with the paperwork to match.

The ground here behaves differently

A lot of this country is black cracking clay. Dry, it’s hard enough to blunt a blade and opens into cracks you can lose a crowbar down. Wet, it turns to grease, holds water instead of shedding it, and won’t compact at any price. The red-brown and gravelly country behaves nothing like it and needs a different approach.

Soil type changes both the method and the price. It’s one of the main reasons we look at a site before we quote.

The wet season is part of the program

From roughly December to March, earthworks stops being productive well before a site becomes impassable. Wet material can’t be compacted, and traffic on a soft surface undoes finished work. We plan around that window: dams and property work suit the dry stretch, and the weeks after a wet season are when the road network needs the most attention. After heavy rain, black soil sites can take days to dry out enough to work, so it’s worth allowing for wet weather in the program.

If your job has a fixed date, tell us early. Some work can be staged so a dry section keeps moving while a wet one dries out, and some can’t. It’s better to know which before the job starts than when the machines are standing, so we’ll work through it with you at the planning stage.

Distance and mobilisation

Floating a machine in and out costs the same whether it works a day or a fortnight, so distance affects what’s worth doing more than the hourly rate. On a short job a long way out, the float can cost more than the work. Combining several jobs into one visit, or timing yours near other work already booked in your area, usually fixes that. Ask, and we’ll tell you whether it stacks up.

For haulage, road train access is set by route and permit across the region rather than by how remote a place feels, so the whole run matters more than the last few hundred metres. If you need material carted, tell us where it’s coming from as well as where it’s going, and we’ll check whether the combination can run it.

Get a price

Tell us where the job is

Send us the town, the access and roughly when you need it, and we’ll tell you how we’d run it.