Industries

Civil Construction

Extra plant and operators for civil contractors, for a stage, a second front or a machine that’s down. You run the job, and our operators work to your program.

A civil construction site with a formed pad, open stormwater trenches and pipe stacked alongside

Our fleet covers excavation, grading, compaction, water and haulage, so it can fill more than one gap at once.

Grader, roller and water truck together make a road crew, booked as one instead of three hires scheduled around each other. An excavator with the side tipper is a complete excavation and cartage operation.

Every machine arrives maintained and pre-started, with an operator who knows it and can work efficiently from the outset.

We work to your setout and your levels, alongside the engineer, surveyor and tester you’ve appointed. Send us the drawings, the program and the stage you need covered, and we’ll tell you which machines fit and when they can start.

What these jobs need

  1. Plant and operators for a stage or a second front
  2. Experienced operators who work to your direction
  3. Machines that arrive maintained and ready to work
  4. Work that fits your program
  5. Cartage capacity to match the excavation rate

Plant on this work

Common questions

Can you work as a subcontractor under our safety system?

Yes. We work under the principal contractor’s system, attend the inductions and work to the site rules and SWMS in place. Send the requirements through before mobilisation, so any documentation you need from us is in your hands beforehand.

Do you take on a whole earthworks package or just supply plant?

Either. Some contractors hand over a scope with a price against it, and others want a machine and operator for a fortnight to direct themselves. Tell us which you want and we’ll price it that way.

Get a price

Tell us the site, the access and roughly when you need it.

Serving Central Queensland, QLD