Topsoil stripping, cut to fill and shaping to design, with our own excavator, loader and side tipper to dig, load and cart the material. Bulk earthworks is the work our fleet is built around.

An excavator loading a road train side tipper from a cut beside grain silos on a rural property

The 36 tonne excavator loads the side tipper directly, so excavation and cartage run at the same pace under one contractor and the job keeps moving. The same machine handles trenching for services and detailed excavation around structures.

Where there’s stockpiling or rehandling, the wheel loader takes that work so the excavator stays in the cut. On bigger open sites, the D8N dozer and the 9RX with scraper bucket move bulk volume across the site. When the finished surface matters, the grader, water truck and roller follow on.

On most jobs the digging is the straightforward part, and the material is what needs planning. We work out where it goes before we start: reused as fill, stockpiled for later, or carted off site. Settling that early keeps the job running and the cartage bill predictable.

What bulk earthworks and excavation covers

  • Topsoil stripping and stockpiling
  • Cut to fill and bulk excavation
  • Site levelling and shaping to design
  • Batter forming and profiling
  • Spoil removal and cartage
  • Trenching and service excavation
  • Detailed excavation around structures

Plant on this work

What may need to be considered

  • Survey setout and design levels. We can work to supplied survey marks and design levels, or work with you to understand the finished result you want and recommend a practical approach for your site.
  • Vegetation clearing. Queensland vegetation management law makes this a regulated activity and we do not offer it.
  • Rock breaking. Excessive amounts of hard rock may require rock breaking or blasting equipment which we do not currently offer. Talk to us about the requirements of your job.
  • Geotechnical, contamination and spoil classification. Where specialist investigation, testing or classification is required, this is completed by the appropriate qualified provider.
  • Location of underground services, or a Before You Dig search.

Common questions about bulk earthworks

Can excavated material be reused on site instead of carted away?

Often, yes. Suitable cut can go straight back in as fill, which saves carting it away and paying for imported material to replace it. Whether it suits depends on the material and what the fill has to carry, which is your engineer’s call, so it’s worth asking before you budget for cartage both ways.

How is bulk earthworks usually priced?

By the hour for the machine and operator, or as a lump sum against a defined scope and volume. Hourly suits jobs where the extent isn’t known yet. A lump sum suits jobs with a drawing and a quantity, and it puts the risk of a slow day on us. We’ll recommend the one that fits your job.

What happens if the ground is different to what was expected?

We tell you as soon as we find it, so you can decide how to proceed before the cost changes. Rock, old fill, buried material and wet ground all change the rate of work. Looking at the site before we quote picks up as much of that as possible up front.

Get a price

Describe the site, the access and roughly when you need it. We’ll tell you what it takes and which plant we’d put on it.

Serving Central Queensland, QLD